forked from bai/curriculum-project-hub
1.9 KiB
1.9 KiB
Initial Production SaaS Readiness
Label: wayfinder:map
Destination
The repository can be deployed from a clean checkout as the initial production multi-tenant Curriculum Project Hub, operated safely on the ADR-0018/0020/0021 single-host Linux topology, with repeatable release evidence, rollback and recovery procedures, and no known critical security or data-integrity gaps.
Notes
spec/remains the semantic source of truth; implementation drift must be surfaced rather than silently resolved.- The initial product boundary follows the accepted ADRs: Organization is the tenant root, customer onboarding may be manual, and full billing, limits, tenant suspension, and self-service platform administration remain deferred unless a readiness investigation proves they are required for safe operation.
- Use the
diagnosing-bugsloop for every reproduced defect. Prefer explicit failures and observable critical paths over fallback behavior. - Work on
saas-production-readiness; make small conventional commits after verified, independently reversible milestones. Do not push without explicit authorization. - Local
lake buildcurrently requires a configured elan toolchain; CI remains the authoritative configured Lean build environment until that local toolchain is available.
Decisions so far
Fog
- The production topology after the initial single-host pilot (HA, horizontal workers, multi-region, or managed container orchestration) depends on measured demand and failure experience.
- Commercial self-service concerns such as billing plans and automated tenant provisioning remain beyond the accepted ADR boundary; revisit after the initial safety and operability route is clear.
- Regulatory retention, residency, and customer-specific compliance controls require product/legal inputs that the repository does not currently contain.