forked from EduCraft/curriculum-project-hub
642 B
642 B
Decide the telemetry, SLO, retention, and alerting control plane
Type: grilling Status: open
Question
For the accepted initial single-host service, decide the log/metric/trace collection and storage path, instance roles, release and correlation identity, redaction/access/retention policy, initial service-level indicators and objectives, error budgets, alert thresholds, on-call destinations, escalation ownership, and telemetry-blind detection. Prefer the smallest operable control plane, but record every domain-visible availability or retry assumption in the appropriate ADR/spec rather than hiding it in dashboard configuration.